Sunday, April 29, 2007

_s-n_o-w_


12 frames/sec. * 120 sec./film = 1440 drawings.
1440 drawings / 36 days until June 6th = 40 drawings per day until June 6th.
40 drawings per day / 12 hours per day = 3.33 drawings per hour or 18 minutes per drawing.
In conclusion, I must produce an animated drawing every 18 minutes during my workday until the due date of my film. This is in ignorance of the fact that I must generate sound for this film.
Uhhhhhhhh oh!

No comments: